San Bernardino, CA, November 23, 2015 - Caltrans advises motorists that experts are predicting a 0.6% increase in all methods of travel nationwide, with approximately 47 million people traveling either by car or by airplane for the Thanksgiving holiday. Thanksgiving is traditionally the highest travel period in the Inland Empire region. Caltrans expects lengthy delays on … [Read more...] about Motorists Advised of Heavy Traffic Delays for the Week of Thanksgiving
CalTrans
SR 18 Paving Project Set to Begin September 9th
Big Bear, CA, Sept. 2, 2015 - The California Department of Transportation District 8 has awarded a $4.1 million project to Matich Corporation that will pave three major segments of State Route 18 between Talmadge Road (at Red Ant Hill) to the SR-138 junction in Crestline, CA. The segments are: Talmadge Road in the City of Big Bear Lake to SR-38 (at the Big Bear Dam); from … [Read more...] about SR 18 Paving Project Set to Begin September 9th
Revised Highway Closure Schedule For Wed. Oct. 15
Big Bear, CA, October 14, 2014 - On Wednesday October 15, Caltrans will be installing a 100 ft. long pedestrian and horse bridge across State Highway 38. The bridge is being installed to safely connect the two halves of Camp Tahquitz, which is bisected by Highway 38, and generates over 20,000 pedestrian crossings per year. Highway 38 will be closed beginning at … [Read more...] about Revised Highway Closure Schedule For Wed. Oct. 15
Slight Change in SR-18 Closure Schedule
Big Bear, CA, October 7, 2014 - Yesterday, Caltrans started the clearing and clean-up work that they will be doing on Arctic Circle this month, beginning the weekly closures of SR-18 between the Big Bear Dam and Snow Valley. There has been a slight change in the schedule however. The 18 will now be closed 8:00 a.m. to 3:00 p.m. (rather than 2:00 p.m.), but will remain Monday … [Read more...] about Slight Change in SR-18 Closure Schedule
Summertime Roadwork
Big Bear Valley, CA, June 19, 2014 - The winter season is hard on our mountain roads, so repair projects and upgrades are in full swing. On the west side of town, a road widening project is taking place. On Big Bear Blvd. between Pine Knot and Paine, primarily in front of Knights Inn and the Fireside Lodge, the north-side shoulder is being rebuilt to widen the road for a new … [Read more...] about Summertime Roadwork


